Case study

St Peter's College, Oxford: a full kitchen refit in a one-week shutdown

We stripped out the college kitchen's 20-year-old floor and replaced the floors and walls with a sealed, hygienic finish, working through a week-long shutdown and out of hours so the kitchen was back in service on time.

St Peter's College kitchen wash-up area before: old safety flooring peeling and breaking up around the drains
Beforewash-up area, old floor failing
St Peter's College wash-up area after: new Altro Stronghold K30 safety floor coved 100mm up the walls, heat-welded
Afternew Altro Stronghold K30, coved and welded
Client
St Peter's College, Oxford
Areas
Main kitchen, wash-up, corridors and service areas
Timescale
One-week shutdown, including out-of-hours working
Floor
Altro Stronghold K30 safety flooring, coved 100mm, heat-welded and thermoformed
Preparation
Old flooring removed, epoxy DPM, F. Ball latex smoothing compound
Walls
Hygienic PVC wall cladding with a two-part clip trim system

On site

Working in the heart of the college

St Peter's is a working college in the centre of Oxford, and its kitchen feeds students and staff every day. We fitted around college life, working through the one-week kitchen shutdown and out of hours so the kitchen was back in service on time.

Oxford Flooring Specialists van parked by the historic stone buildings at St Peter's College, Oxford
Our van on site at St Peter's College, Oxford

How we did it

Five stages, all completed inside the college's one-week kitchen shutdown.

  1. 1

    Strip out

    We ripped up the old 20-year-old flooring back to the concrete, and dug out and cleaned the recessed access covers so they could be finished flush.

  2. 2

    Epoxy damp-proof membrane

    An epoxy DPM went down across the whole kitchen and wash-up, sealing the slab so moisture can't affect the new floor.

  3. 3

    Latex smoothing

    We laid F. Ball latex smoothing compound over the DPM for a flat, level base. Safety flooring shows every bump underneath, so this stage matters.

  4. 4

    Hygienic wall cladding

    The walls were lined with white hygienic PVC cladding, set out with a laser and finished with a two-part clip trim system.

  5. 5

    Altro Stronghold K30, coved and welded

    Finally we laid Altro Stronghold K30 safety flooring, coved 100mm up every wall. Every joint is heat-welded and the corners are thermoformed, so floor and walls form one sealed, wipe-clean surface.

The finished kitchen